The Hit Movie, AVATAR Processed on HP Blade Servers
Since the hit movie AVATAR surpassed the $1 Billion Revenue mark this weekend I thought it would be interesting to post some information about how the movie was put together – especially since the hardware behind the magic was the HP BL2x220c.
According to an article from information-management.com, AVATAR was put together at a visual effects production house called Weta Digital located in Miramar, New Zealand. Weta’s datacenter sits in a 10,000 square foot facility however the film’s computing core ran on 2,176 HP BL 2x220c Blade Servers. This added up to over 40,000 processors and 104 terabytes of RAM
. (Check out my post on the HP BL 2x220c blade server for details on this 2 in 1 server design by HP.)
The HP blades read and wrote data against 3 petabytes of fast fiber channel disk network area storage from BluArc and NetApp. According to the article, all of the gear was connected by multiple 10-gigabit network links. “We need to stack the gear closely to get the bandwidth we need for our visual effects, and, because the data flows are so great, the storage has to be local,” says Paul Gunn, Weta’s data center systems administrator.
The article also highlights the fact that the datacenter uses water cooled racks to keep the racks and storage cooled.
Suprisingly, the water cooled design, along with a cool local climate, allows Weta to run their datacenter for less cost than running air conditioning (all they pay for is the cost of running water.) In fact, they recently won an energy excellence award for building a smaller footprint that came with 40% lower cooling cost.
Summary of Hardware Used for AVATAR:
- 34 racks – each with 4 HP BladeSystem Chassis, 32 servers (16 BL2x220c)
- over 40,000 processors
- 104 TB RAM
Since I don’t want to re-write the excellent article from information-management.com, I encourage you to click here to read the full article.
Follow me on Twitter
My TweetsCategories
- AMD (1)
- ARM (1)
- Cisco (55)
- Citrix (1)
- Cloud Computing (1)
- Comdex (1)
- Dell (74)
- Fujitsu (1)
- Future Technologies (9)
- Gartner (3)
- History (4)
- HP (76)
- HPC (2)
- IBM (74)
- IDC (18)
- Intel (13)
- Market Analysis (6)
- Microserver (1)
- Microsoft (1)
- Networking (1)
- News (2)
- Performance (4)
- Power (4)
- Reviews (2)
- Server Comparisons (18)
- Uncategorized (12)
- Virtualization (1)
- VMmark (2)
- VMware (11)
Blogroll
- Absolute Windows – John Obeto
- BladeWatch – Martin Macleod
- GestaltIT – Stephen Foskett
- HP Storage Blog – Calvin Zito
- iKnerd – Greg Knieriemen
- Infosmack Podcasts – Greg Knieriemen
- M. Sean McGee
- Pack Rat – Stephen Foskett
- Storage Nerve – Devang Panchigar
- Tech Virtuoso – Frank Owen
- TechHead – Simon Seagrave
- The Storage Architect – Chris Evans
- VM Etc – Rich Brambley





Pingback: uberVU - social comments
Pingback: Blades Made Simple · Weta Digital, Production House for AVATAR, Donates IBM Blade Servers to Schools
Pingback: Weta Digital, Production House for AVATAR, Donates IBM Blade Servers to Schools « BladesMadeSimple.com (MIRROR SITE)
Pingback: In Pictures: The HP hardware behind the movie Avatar | TechHead.co.uk
Pingback: Kevin Houston
Pingback: Audun Saltvik
Pingback: leslie gillette
Pingback: HP Blade team
Pingback: Eric Anderson
Pingback: Richard Mena
Pingback: Akiko Tominaga
Pingback: Alberto Cubero
Pingback: Blades Made Simple » Blog Archive » Yet Another Win for HP Blades, but Why?
Pingback: Yet Another Win for HP Blades, but Why? « BladesMadeSimple.com (MIRROR SITE)
Pingback: Kevin Houston
Pingback: Kevin Houston
Pingback: Reijo Nyberg
Pingback: Blades Made Simple™ » Blog Archive » 2010 Stats for BladesMadeSimple.com