(UPDATED) IDC Q1 2010 Report: Blade Servers Growing, With #1 Market Share Going To…

NOTE: IDC revised their report on May 28, 2010.  This post now includes those changes.

IDC reported on May 28, 2010 that worldwide server sales for Q1 2010 factory revenues increased 4.6  4.7% year over year to $10.4 billion in the first quarter of 2010 (1Q10).  They also reported the blade server market accelerated and continued its sharp growth in the quarter with factory revenue increasing 37.1% 37.2% year over year, with shipment growth increasing by 20.8% compared to 1Q09.  According to IDC, nearly 90% of all blade revenue is driven by x86 systems, a segment in which blades now represent 18.8% of all x86 server revenue. Continue reading →

(UPDATED) Prize Fight: IBM MAX5 vs Dell FlexMem Bridge

Updated 5/24/2010 – I’ve received some comments about expandability and I’ve received a correction about the speed of Dell’s memory, so I’ve updated this post.  You’ll find the corrections / additions below in GREEN.

Since I’ve received a lot of comments from my post on the Dell FlexMem Bridge technology, I thought I would  do an unbiased comparison between Dell’s FlexMem Bridge technology (via the PowerEdge 11G M910 blade server) vs IBM’s MAX5 + HX5 blade server offering.  In summary both offerings provide the Intel Xeon 7500 CPU plus the ability to add “extended memory” offering value for virtualization, databases and any other workloads that benefit from large amounts of memory. Continue reading →

Dell FlexMem Bridge Helps Save 50% on Virtualization Licensing

Let’s face it.  Virtualization is everywhere.  

Odds are there is something virtualized in your data center.  If not, it soon will be.  As more workloads become virtualized, chances are you are going to run out of “capacity” on your virtualization host.  When a host’s capacity is exhausted, 99% of the time it is because the host ran out of memory, not CPU.   Continue reading →

More Blade Server Rumours

It’s been a while since I’ve posted what rumours I’m hearing, so I thought I’d dig around and see what I can find out.  NOTE: this is purely speculation, I have no definitive information from any vendor about any of this information so this may be false info.  Read at your own risk. Continue reading →

Another Dell Innovation – Lifecycle Controller

Perhaps one of Dell’s best kept secrets on their 11G servers (blade, rack and tower) is something called Lifecycle Controller. This innovative offering allows a user to configure the hardware, run diagnostics and prep the server for an operating system. “SO WHAT?” you are probably thinking – “HP and IBM have this with their SmartStart and ServerGuide CD’s!” Yes, you are right, however Continue reading →

Running CAD on a Blade? Possible on HP’s WS460c G6 Workstation Blade

What if you could run a graphics intensive application, like CAD from Chicago, and you were sitting in Atlanta?  What if you could work on a multi-million dollar animated movie feature from the luxury of your home?  These and more could be possible with the HP WS460c G6 Workstation Blade.  Continue reading →

Yet Another Win for HP Blades, but Why?

I heard a rumour on Friday that HP has been chosen by another animated movie studio to provide the blade servers to render an upcoming movie. To recount the movies that have used / are using HP blades: Continue reading →

It's A Bird, It's a Plane, it's Superdome 2 – ON A BLADE SERVER

Wow.  HP continues its “blade everything” campaign from 2007 with a new offering today – HP Integrity Superdome 2 on blade servers.  Touting a message of a “Mission-Critical Converged Infrastructure” HP is combining the mission critical Superdome 2 architecture with the successful scalable blade architecture. Continue reading →

Will LIGHT Replace Cables in Blade Servers?

Part of the Technology Behind Lightfleet's Optical Interconnect Technology (courtesy Lightfleet.com)

CNET.com recently reported that for the past 7 years, a company called Lightfleet has been working on a way to replace the cabling and switches used in blade environments with light, and in fact has already delivered a prototype to Microsoft Labs.  Continue reading →

Behind the Scenes at the InfoWorld Blade Shoot-Out

Daniel Bowers, at HP, recently posted some behind the scenes info on what HP used for the InfoWorld Blade Shoot-Out that I posted on a few weeks ago (check it out here) which led to HP’s blade design taking 1st place.  According to Daniel, HP’s final config consisted of:

  • a c7000 enclosure
  • 4 ProLiant BL460c G6 server blades (loaded with VMWare ESX) built with 6-core Xeon processors and 8GB LVDIMMs
  • 2 additional BL460c G6’s with StorageWorks SB40c storage blades for shared storage
  • a Virtual Connect Flex-10 module
  • a 4Gb fibre switch

Jump over to Daniel’s HP blog at to read the full article including how HP almost didn’t compete in the Shoot-Out and how they controlled another c7000 enclosure 3,000 miles away (Hawaii to Houston). 

Daniel’s HP blog is located at http://www.communities.hp.com/online/blogs/eyeonblades/archive/2010/04/13/behind-the-scenes-at-the-infoworld-blade-shoot-out.aspx